Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Problem 4-1A a-e (Video) Combat Fire, Inc. manufactures steel cylinders and nozzles for two models of fire extinguishers: (1) a home fire extinguisher and (2)

image text in transcribed
image text in transcribed
image text in transcribed
image text in transcribed
Problem 4-1A a-e (Video) Combat Fire, Inc. manufactures steel cylinders and nozzles for two models of fire extinguishers: (1) a home fire extinguisher and (2) a commercial fire extinguisher. The home model is a high-volume (54,000 units), half-gallon cylinder that holds 2 1/2 pounds of multi-purpose dry chemical at 480 PSI. The commercial model is a low-volume (10,200 units), two-gallon cylinder that holds 10 pounds of multi-purpose dry chemical at 390 PSI. Both products require 1.5 hours of direct labor for completion. Therefore, total annual direct labor hours are 96,300 or (1.5 hours (54,000 + 10,200)). Estimated annual manufacturing overhead is $1,568,390. Thus, the predetermined overhead rate is $16.29 or ($1,568,390 +96,300) per direct labor hour. The direct materials cost per unit is $18.50 for the home model and $26.50 for the commercial model. The direct labor cost is $19 per unit for both the home and the commercial models. The company's managers identified six activity cost pools and related cost drivers and accumulated overhead by cost pool as follows Estimated Use of Drivers by Product Estimated Use of Activity Cost Pools Cost Drivers Estimated Overhead Cost Drivers Home Commercial Receiving Pounds $87,100 335,000 215,000 120,000 Forming Machine hours 152,950 35,000 27,000 8,000 Assembling Number of parts 410,130 217,000 165,000 52,000 Testing Number of tests 44,880 25,500 15,500 10,000 Painting Gallons 52,580 5,258 3,680 Packing and shipping Pounds 820,750 335,000 215,000 120,000 $1,568,390 1,578 Under traditional product costing, compute the total unit cost of each product. (Round answers to 2 decimal places, e.g. 12.50.) Home Model Commercial Model Total unit cost $ Show All Job Order Costippt Under ABC, prepare a schedule showing the computations of the activity-based overhead rates (per cost driver). (Round overhead rate to 2 decimal Estimated Activity Cost Pool Estimated Activity-Based Overhead Use of Cost Drivers Overhead Rate Receiving $ Pounds $ per pound Forming Machine hours $ per machine hour Assembling Parts $ per part Testing Tests $ per test Painting Gallons $ per gallon Packing and shipping Pounds $ per pound $ Home Model Estimated Use of Activity-Based Drivers Overhead Rates Cost Assigned Activity Cost Pool Receiving Commercial Model Estimated Use of Activity-Based Drivers Overhead Rates Cost Assigned Forming $ Assembling $ $ Testing $ $ Painting 1 $ Packing and shipping $ Total costs assigned (a) $ $ Units produced (b) Overhead cost per unit [(a) + (b)] $ Compute the total cost per unit for each product under ABC. (Round answer to 2 decimal places, 0.9. 12.25.) Compute the total cost per unit for each product under ABC. (Round answer to 2 decimal places, e.g. 12.25.) Home Model Commercial Model Total cost per unit Classify each of the activities as a value-added activity or a non-value-added activity, Activity Receiving Forming Assembling Testing Painting Packing and shipping

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

The Practice Of Modern Internal Auditing

Authors: Lawrence B Sawyer

1st Edition

B0006C58OA, 978-0894130120

More Books

Students also viewed these Accounting questions