Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Problem 4-1A Combat Fire, Inc. manufactures steel cylinders and nozzles for two models of fire extinguishers: (1) a home fire extinguisher and (2) a commercial

Problem 4-1A Combat Fire, Inc. manufactures steel cylinders and nozzles for two models of fire extinguishers: (1) a home fire extinguisher and (2) a commercial fire extinguisher. The home model is a high-volume (54,000 units), half-gallon cylinder that holds 2 1/2 pounds of multi-purpose dry chemical at 480 PSI. The commercial model is a low-volume (10,200 units), two-gallon cylinder that holds 10 pounds of multi-purpose dry chemical at 390 PSI. Both products require 1.5 hours of direct labor for completion. Therefore, total annual direct labor hours are 96,300 or [1.5 hours (54,000 + 10,200)]. Expected annual manufacturing overhead is $1,584,280. Thus, the predetermined overhead rate is $16.45 or ($1,584,280 96,300) per direct labor hour. The direct materials cost per unit is $18.50 for the home model and $26.50 for the commercial model. The direct labor cost is $19 per unit for both the home and the commercial models. The companys managers identified six activity cost pools and related cost drivers and accumulated overhead by cost pool as follows. Expected Use of Drivers by Product Activity Cost Pools Cost Drivers Estimated Overhead Expected Use of Cost Drivers Home Commercial Receiving Pounds $80,400 335,000 215,000 120,000 Forming Machine hours 150,500 35,000 27,000 8,000 Assembling Number of parts 412,300 217,000 165,000 52,000 Testing Number of tests 51,000 25,500 15,500 10,000 Painting Gallons 52,580 5,258 3,680 1,578 Packing and shipping Pounds 837,500 335,000 215,000 120,000 $1,584,280 Under traditional product costing, compute the total unit cost of each product. (Round answers to 2 decimal places, e.g. 12.50.) Home Model Commercial Model Total unit cost $ $ Under ABC, prepare a schedule showing the computations of the activity-based overhead rates (per cost driver). (Round overhead rate to 2 decimal places, e.g. 12.25.) Activity Cost Pool Estimated Overhead Expected Use of Cost Drivers Activity-Based Overhead Rate Receiving $ Pounds $ per pound Forming Machine hours $ per machine hour Assembling Parts $ per part Testing Tests $ per test Painting Gallons $ per gallon Packing and shipping Pounds $ per pound $ Prepare a schedule assigning each activitys overhead cost pool to each product based on the use of cost drivers. (Round overhead cost per unit to 2 decimal places, e.g. 12.25 and cost assigned to 0 decimal places, e.g. 2,500.) Home Model Commercial Model Activity Cost Pool Expected Use of Drivers Activity-Based Overhead Rates Cost Assigned Expected Use of Drivers Activity-Based Overhead Rates Cost Assigned Receiving $ $ $ $ Forming $ $ Assembling $ $ Testing $ $ Painting $ $ Packing and shipping $ $ Total costs assigned (a) $ $ Units produced (b) Overhead cost per unit [(a) (b)] $ $ Compute the total cost per unit for each product under ABC. (Round answer to 2 decimal places, e.g. 12.25.) Home Model Commercial Model Total cost per unit $ $ Classify each of the activities as a value-added activity or a nonvalue-added activity. Activity Receiving Forming Assembling Testing Painting Packing and shipping

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions