Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Problem 9-46 Activity-Based Costing and Predetermined Overhead Rates (LO 9-3, 5, 6) Cain Components manufactures and distributes various plumbing products used in homes and other

Problem 9-46 Activity-Based Costing and Predetermined Overhead Rates (LO 9-3, 5, 6)

Cain Components manufactures and distributes various plumbing products used in homes and other buildings. Over time, the production staff has noticed that products they considered easy to make were difficult to sell at margins considered reasonable while products that seemed to take a lot of staff time were selling well despite recent price increases. A summer intern has suggested that the cost system might be providing misleading information.

The controller decided that a good summer project for the intern would be to develop,in one self-contained area of the plant, an alternative cost system with which to compare the current system. The intern identified the following cost pools and, after discussion with some plant personnel, appropriate cost drivers for each pool. There were:

Cost Pools Costs Activity Drivers
Receiving 600000 Direct material cost
Manufacturing 5500000 Machine hours
Machine Setup 900000 # of setups
Shipping 1000000 Units Shipped

In this particular area, Cain produces two of its many products: Standard and Deluxe.The following are data for production for the latest full year of operations:

Standard Deluxe
total direct material costs 245000 155000
total direct labor costs 650000 250000
total machine hours 150000 100000
total # of setups 75 125
total pounds of material 18000 9000
toal direct labor hours 6000 3750
# of units produced and shipped 20000 5000

The intern decides to look more closely at the manufacturing activity and determines that it can be broken down into two activities: production and engineering.Production covers the costs of on-going manufacturing while engineering includes those activities dealing with engineering changes, design modifications, and so on.

The costs attributed to production are $3,300,000 and the costs attributed to engineering are $2,200,000. After discussion with plant engineers, the intern decides that the best cost driver for engineering is setups, because most of the work arises from changes in the way the product is run.

What unit product costs will be reported for the two products if the revised ABC system is used? (Round your intermediate computations and final answers to two decimal places.)

Receiving ? of material dollars
Manufacturing ? per machine hour
Enginerring ? per setup
Machine setup ? per setup
Shipping ? per unit

Standard Deluxe
Direct costs ? ?
Overhead:
Receiving ? ?
Manufacturing ? ?
Engineering ? ?
Machine setup ? ?
Shipping ? ?
Total costs ? ?
# of units ? ?
Unit cost ? ?

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Quality Assessment Manual For The Internal Audit Activity

Authors: The Internal Audit Foundation

2017 Edition

0894139975, 978-0894139970

More Books

Students also viewed these Accounting questions

Question

Does it exceed two pages in length?

Answered: 1 week ago

Question

Does it avoid typos and grammatical errors?

Answered: 1 week ago