Question
Problem 9-62 given: Cost Pools Costs Activity Drivers Receiving $600,000 Direct material cost Manufacturing 5,500,000 Machine-hours Machine setup 900,000 Production runs Shipping $1,000,000 Units shipped
Problem 9-62 given: | ||
Cost Pools | Costs | Activity Drivers |
Receiving | $600,000 | Direct material cost |
Manufacturing | 5,500,000 | Machine-hours |
Machine setup | 900,000 | Production runs |
Shipping | $1,000,000 | Units shipped |
Products | ||
Standard | Deluxe | |
Total direct material costs | $245,000 | $155,000 |
Total direct labor costs | $650,000 | $250,000 |
Total machine-hours | 150,000 | 100,000 |
Total number of setups | 75 | 125 |
Total pounds of material | 18,000 | 9,000 |
Total direct labor-hours | 6,000 | 3,750 |
Number of units produced and shipped | 20,000 | 5,000 |
Refer to Problem 9-62. The intern decides to look more closely at the manufacturing activity and determines that it can be broken down into two activities: production and engineering. Production covers the costs of ongoing manufacturing while engineering includes those activities dealing with engineering changes, design modifications, and so on. The costs attributed to production are $3,300,000, and the costs attributed to engineering are $2,200,000. After discussion with plant engineers, the intern decides that the best cost driver for engineering is setups, because most of the work arises from changes in the way the product is run. Required a. What unit product costs will be reported for the two products if the revised ABC system is used?"
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started