Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Product X is anticipated to consume 40 machine setups, whereas Product Y will consume 20 setups. The budgeted cost for the machine setups cost pool
Product X is anticipated to consume 40 machine setups, whereas Product Y will consume 20 setups. The budgeted cost for the machine setups cost pool is $90,000. In the assembly cost pool, the budgeted cost is $168,000. Product X is budgeted to consume 300 machine-hours at the rate of 0.5 machine-hours per unit and Product Y will consume 400 machine-hours at the rate of 0.2 hours per unit. A total of 600 inspections will be performed on Product X and 400 inspections will be performed on Product Y at a total inspection cost of $120,000. Budgeted total direct labour-hours for Product X is 1,200 hours and for Product Y is 6,000 hours. Required a. Determine the overhead cost allocation to Product Y and to Product X if activity-based costing (ABC) is used and if the traditional method with direct labour-hours as the allocation base is used. (13) (Disclose all necessary supporting calculation steps or 0 mark will be given) ABC approach Supporting calculations: b. Explain why the costs have shifted in the manner you have described in part (a) when ABC is applied instead of the traditional method of overhead cost allocation. (3)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started