Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Production plan and control. please answer all parts thoroughly. Positively Rivet Inc. is a small machine shop that produces sheet metal products. It had one

image text in transcribed

Production plan and control.

please answer all parts thoroughly.

Positively Rivet Inc. is a small machine shop that produces sheet metal products. It had one line dedicated to the manufacture of light-duty vent hood shells, but because of strong demand it recently added a second line. The new line makes use of higher-capacity automated equipment but consists of the same basic four processes as the old line. In addition, the new line makes use of one machine per workstation, while the old line has parallel machines at the workstations. The processes, along with their machine rates, number of machines per station, and average times for a lone job to go through a station (i.e., not including queue time), are given for each line in the following table: Over the past three months, the old line has averaged 315 parts per day, where one day consists of one eight-hour shift, and has had an average WIP level of 400 parts. The new line has averaged 680 parts per eight-hour day with an average WIP level of 350 parts. Management has been dissatisfied with the performance of the old line because it is achieving lower throughput with higher WIP than the new line. Your job is to evaluate these two lines to the extent possible with the above data and identify potentially attractive improvement paths for each line by addressing the following questions. a. Compute rb,T0, and W0 for both lines. Which line has the larger critical WIP? Explain why. b. Compare the performance of the two lines to the practical worst case. What can you conclude about the relative performance of the two lines compared to their underlying capabilities? Is management correct in criticizing the old line for inefficiency? c. If you were the manager in charge of these lines, what option would you consider first to improve throughput of the old line? Of the new line? d. Is there any critical workstation in the old line that require especial attention? e. Is there any critical workstation in the new line that require especial attention

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Foodservice Management Principles And Practices

Authors: June Payne Palacio, Monica Theis

13th Edition

0133801101, 9780133801101

More Books

Students also viewed these General Management questions