Question

1 Approved Answer

Project: Default Project Details: Building: Maximus Bakhoum Assessment 2 A: Code B: Description C: Quantity D: Unit E: Rate F: Subtotal G: Factor H: Total

image text in transcribedimage text in transcribedimage text in transcribedimage text in transcribedimage text in transcribedimage text in transcribedimage text in transcribedimage text in transcribedimage text in transcribed
Project: Default Project Details: Building: Maximus Bakhoum Assessment 2 A: Code B: Description C: Quantity D: Unit E: Rate F: Subtotal G: Factor H: Total 1 1 Employers Requirements 2 1.1 water presure cleaner - a water presure 1 item cleaner is required as to clean the site from 2,683.68 2,684 2,684 all debris and keep it clean and safe once a week 3 2 Management and Staff 4 2 .1 Site Manager - a site manager is needed to 1 item make sure the project is running smoothly 244,364.80 244,365 244,365 until completion of the project 5 3 Facilities and Services 6 3.1 Skip Bin 15m3 - Skip bins are needed to put 1 item 7,181.80 7,182 all excess waste in to make sure the site is 7,182 organised and safe with no hazards 7 4 Temporary Works 8 4.1 fencing- fencing is needed to close off the 1 item 1,317.60 1,318 project site from unauthorised people and 1,318 secure the site 9 5 Site Accommodations 10 5.1 toilet-tempory toilets are ned until perminent toilets are built 1 item 3,000.00 3,000 3,000 11 6 Contract Conditions 12 6.1 nsurance - insurence is required to cover the duration of the project for safety of the 1 item 21,600.00 21,600 21,600 contractors and the site 13 7 Mechanical Plant 14 7.1 crane- a crane is required to help with the erection of the building 1 item 6,750.0 6,750 6,750 15 8 Non-Mechanical plan 16 8 external scaffolding - scaffolding is required to make sure the project is built correctly and 1 item 38,800.80 38,801 38,601 safely 17 Total sum 325,699 iTWO costX 9/10/2023 2:33:03 PM EDUCATIONAL VERSION Page 1 of 1Project: Default Project Details: Building: Maximus Bakhoum Assessment 2 A: Code B: Description C: Quantity |D: Unit E: Rate F: Factor G: Total H: Include 1 1.1 water presure cleaner - a water presure day 111.82 24.0000 2,683.6 2,683.68 cleaner is required as to clean the site from all debris and keep it clean and safe once a week iTWO costX 9/10/2023 2:17:01 PM EDUCATIONAL VERSION Page 1 of 1Project: Default Project Details: Building: Maximus Bakhoum Assessment 2 A: Code B: Description C: Quantity D: Unit E: Rate F: Factor G: Total H: Include 2.1 Site Manager - a site manager is needed 32 hrs 190.91 40.0000 244,364.80 244,364.80 make sure the project is running running smoothly until completion of the project 2 hourly rate of $190.91/hr iTWO costX 9/10/2023 2:18:04 PM EDUCATIONAL VERSION Page 1 of 1Page 1 of 1 Project: Default Project Details: Building: Maximus Bakhoum Assessment 2 A: Code B: Description C: Quantity D: Unit E: Rate F: Factor G: Total H: Include 3.1 Skip Bin 15m3 - Skip bins are needed to put week 1,436.36 5.0000 7, 181.80 all excess waste in to make sure the site is 7,181.80 organised and safe with no hazards 2 combination rubbish 15m3 3 changed when full iTWO costX 9/10/2023 2:18:33 PM EDUCATIONAL VERSION Page 1 of 1Page 1 of 1 Project: Default Project Details: Building: Maximus Bakhoum Assessment 2 A: Code B: Description C: Quantity D: Unit E: Rate F: Factor G: Total H: Include 1 4.1 fencing- fencing is needed to close off the 10.98 120.0000 1,317.60 project site from unauthorised people and 1,317.60 secure the site 2 parimiter of site 120m 3 hire over 30m cost per meter for any time period iTWO costX 9/10/2023 2:19:10 PM EDUCATIONAL VERSION Page 1 of 1Page 1 of 1 Project: Default Project Details: Building: Maximus Bakhoum Assessment 2 A: Code B: Description C: Quantity D: Unit E: Rate F: Factor G: Total H: Include 5.1 toilet-tempory toilets are necessary on site week 200.00 15.0000 3,000.00 3,000.00 until perminent toilets are built 2 200 per week iTWO costX 9/10/2023 2:19:43 PM EDUCATIONAL VERSION Page 1 of 1Project: Default Project Details: Building: Maximus Bakhoum Assessment 2 A: Code B: Description C: Quantity | D: Unit E: Rate F: Factor G: Total H: Include 6.1 insurance - insurence is required to cover the 1 policy 900.00 24.0000 21,600.00 21,600.00 duration of the project for safety of the contractors and the site iTWO costX 9/10/2023 2:20:18 PM EDUCATIONAL VERSION Page 1 of 1Project: Default Project Details: Building: Maximus Bakhoum Assessment 2 A: Code B: Description C: Quantity D: Unit E: Rate F: Factor G: Total H: Include 7.1 crane- a crane is required to help with the 1 hrs 225.00 30.0000 6,750.00 6,750.00 erection of the building 2 mobile crane 20 tone capacity iTWO costX 9/10/2023 2:20:52 PM EDUCATIONAL VERSION Page 1 of 1Project: Default Project Details: Building: Maximus Bakhoum Assessment 2 A: Code B: Description C: Quantity D: Unit E: Rate F: Factor G: Total H: Include 7.1 crane- a crane is required to help with the 1 hrs 225.00 30.0000 6,750.00 6,750.00 erection of the building 2 mobile crane 20 tone capacity iTWO costX 9/10/2023 2:20:52 PM EDUCATIONAL VERSION Page 1 of 1

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Strategic Management Formulation Implementation And Control In A Dynamic Environment

Authors: Abbass Alkhafaji, Richard Alan Nelson

1st Edition

0789018098, 978-0789018090

More Books

Students also viewed these General Management questions

Question

=+ b. A change in weather patterns increases the depreciation rate.

Answered: 1 week ago