Question
1 Approved Answer
Project: Move 1,000,000 bcy of borrow from Point A to Point B Material and haul route conditions between A and B: accel/decel 200' segments
Project: Move 1,000,000 bcy of borrow from Point A to Point B Material and haul route conditions between A and B: accel/decel 200' segments to be at 5 mph for the first and last segments each way.) Assume you have the following equipment available in unlimited supply. UPDATED EQUIPMENT AND OPERATOR COSTS Equipment costs: Operator costs: Pushers: Pusher: $ 100.00/hr $ 65.00/hr Cat 631E Scrapers: $ 150.00/hr Scraper: $ 69.00/hr Assume a 5-day, 8-hrs/day workweek. Assume adverse weather (unworkable day of workweek) 20% of the time. Assume equipment out of service for repairs 5% of time during a workweek. Assume Operators paid for actual work time and during repair time. Assume Equipment rate charged to project is reduced to 50% during rain and repair hrs Assume fixed field overhead support cost is $ $700.00/day (includes repair & down time) Assume mobe/demobe costs are $1000.00 per pusher and $1,200.00 per scraper each way. All for the price of: Time of completion: calendar days Assumptions or conditions other than those included above: 123+ 1. 2. 3. 4.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started