Concrete is to be placed into prepared formwork of 4m in height to construct walls for an industrial building at a remote location. The

image text in transcribed  

Concrete is to be placed into prepared formwork of 4m in height to construct walls for an industrial building at a remote location. The concrete will require a retarding admixture to be added to facilitate the transport and handling of the concrete into the formwork. You are informed that the maximum lateral design pressure the formwork can withstand is 80kPa. You are to assume that the concrete temperature is 27C and the concrete density is 2,400 kg/m. (4 marks) Using the above information and the data specific to your ZID listed in Table 2, determine what cementitious material should be used to construct the walls. Last digit of zZID 0-3 4-6 7-9 Table 2 Maximum vertical placement rate (m/h) 0.55 0.40 0.50 Wall width (m) 0.5m 1m 2m

Step by Step Solution

There are 3 Steps involved in it

Step: 1

To determine the appropriate cementitious material for constructing the walls we need to calculate t... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Accounting Principles Part 2

Authors: Jerry J. Weygandt, Donald E. Kieso, Paul D. Kimmel, Barbara Trenholm, Valerie Kinnear, Joan E. Barlow

6th Canadian edition Volume 1

1118306791, 978-1118306796

More Books

Students also viewed these Finance questions

Question

5 . 8 . 1 : LAB - Database programming with Python ( SQLite )

Answered: 1 week ago