Answered step by step
Verified Expert Solution
Question
1 Approved Answer
PROVIDE THE CORRECT ANSWER DONT SPAM THE QUESTION !!!!!!!!!!!!!!! The Feed-in-Tariff (FiT) rates in Malaysia for Solar PV (Individual) installation is shown in table below.
PROVIDE
THE CORRECT
ANSWER
DONT
SPAM
THE QUESTION !!!!!!!!!!!!!!!
The Feed-in-Tariff (FiT) rates in Malaysia for Solar PV (Individual) installation is shown in table below. Assume that you want to install 22 kWp of Solar PV system to your house in December 2022 and the Solar PV system is fully imported. Determine the payback period if your capital investment is RM40000. Assume that the Peak Sun Hours (PSH) is 3.3. If you increase the PV capacity installed to 7 kWp and use locally manufactured PV modules, calculate the payback period with the double capital investment when the PV system is installed in March 2023. (20 Marks) Description of Qualifying Renewable Energy Installation Basic Fit rates having installed capacity of: (i) up to and including 4kW FiT Rates (RM Fit Rates (RM per kWh) per kWh) 2013 2014 1.1316 1.0411 1.0157 (ii) above 4kW and up to and including 24kW 1.1040 Bonus Fit rates having the following criteria (one or more): (i) use as installation in buildings or building +0.2392 structures +0.2201 (ii) use as building materials +0.2300 +0.2116 (iii) use of locally manufactured or assembled solar PV modules +0.0500 +0.0030 (iv)use of locally manufactured or assembled solar inverters +0.0100 +0.0100Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started