puy esse disa eBook Calculator Calculating Departmental Overhead Rates Using Post-Allocation Costs Valron Company has two support departments, Human Resources and General Factory, and two producing departments, Fabricating and Assembly Support Departments Producing Departments Human Resources $160,000 General Factory $340,000 Fabricating $114,600 Assembly 593,000 Direct costs Normal activity: Number of employees 60 80170 5,700 13,300 Square footage 1,000 The costs of the Human Resources Department are allocated on the basis of number of employees, and the costs of General Factory are allocated on the basis of square footage. Valron Company uses the direct method of support department cost allocation. Solve for the allocated costs to Fabricating and Assembly using the direct method of support department cost allocation. The Fabricating Department overhead rate is based on normal activity of 82,000 machine hours. The Assembly Department overhead rate is based on normal activity of 160,000 direct labor hours. Job 316 required six machine hours in Fabricating and four direct labor hours in Assembly. Total direct materials cost $120, and total direct labor cost was $80. Required: 1. Calculate the overhead rate for Fabricating based on machine hours and the overhead rate for Assembly based on direct labor hours. If required, round your answers to the nearest cent. Use the rounded values for subsequent calculations Overhead Rate Previous Next > Check My Work Email instructor Email Instructor Save and Ex Submit Assignment for Grading All work saved. Calculator Number of employees 80 Square footage 1,000 5,700 13.300 The costs of the Human Resources Department are allocated on the basis of number of employees, and the costs of General Factory are allocated on the basis of squa footage. Valron Company uses the direct method of support department cost allocation. Solve for the allocated costs to Fabricating and Assembly using the direct meth of support department cost allocation. The Fabricating Department overhead rate is based on normal activity of 82,000 machine hours. The Assembly Department overhead rate is based on normal activity of 160,000 direct labor hours. Job 316 required six machine hours in Fabricating and four direct labor hours in Assembly. Total direct materials cost $120, and total direct labor cost was $80. Required: 1. Calculate the overhead rate for Fabricating based on machine hours and the overhead rate for Assembly based on direct labor hours. If required, round your answers to the nearest cent. Use the rounded values for subsequent calculations, Overhead Rate Fabricating department per mach. hr. Assembly department per DLH 2. Using the overhead rates calculated in Requirement 1, calculate the cost of Job 316. If required, round your answer to the nearest cent. 3. What if Job 316 had required one machine hour in Fabricating and four direct labor hours in Assembly Direct labor and direct materials costs remained the same Calculate the new cost of Job 316. If required, round your answer to the nearest cent. $ Previous Next > Check My Work Email Instructor Save and Exit Submit Assignment for Grading All work saved