Question
Q 2 PNG Corporation designs and builds roller coasters for amusement parks. At the end of 20x1, managers estimated overhead costs for 20x2 of $150,000
Q 2 PNG Corporation designs and builds roller coasters for amusement parks. At the end of 20x1, managers estimated overhead costs for 20x2 of $150,000 based on expected production of 5 roller coasters (5 jobs) using 5,000 labor hours each. Actual overhead costs for 20x2 were $170,000. PNG actually designed and built 6 roller coasters (6 jobs) with the following direct labor usage and overhead costs: Actual Overhead Cost actual Labor Hours The Big Dipper (job 1) $28,000 3,500 The Ultimate Scream (job 2) 35,000 4,000 Loop Me (job 3) 27,000 5,000 The Screaming Chicken (job 4) 40,000 2,500 You Dont Know Coasters (job 5) 25,000 6,000 Old Faithful (job 6) 15,000 4,500 Assume PNG uses a normal costing system with the number of labor hours as the overhead allocation base.
a. Calculate the allocation rate for 20x2.
b. Calculate the total corporate over- or underapplied overhead (specify which) for 20x2.
Q3 Following are production data for a process costing system. Beginning work in process, 30% complete 12,000 units Started 90,000 units Ending work in process, 70% complete 8,000 units Costs: Beginning work in process: Direct Materials $ 28,800 Conversion costs 5,220 Materials used during the period 216,000 Conversion costs incurred during the period 139,200
a. Using the FIFO basis, prepare a process costing report.
b. Write out the journal entries for the costs incurred and the work performed this period under the FIFO method.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started