Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Q1) 2020 2025 Newspaper $20 $50, $25 $16 $25 $30 $25 $22 $29 $15 $30 $20 Pair of jeans $60 $75.99 $75 $55 $50 $65

Q1) 2020 2025

Newspaper $20 $50, $25 $16 $25 $30 $25 $22 $29 $15 $30 $20

Pair of jeans $60 $75.99 $75 $55 $50 $65 $55 $50 $34 $55 $70 $30

1- bedroom apartment $700 $988 $920 $950 $975 $930 $800 $850 $1100 $1050 $900 $800

For the each item, use their YEAR 2025 results to determine

(1) Use the mean YEAR2025 prices are the base price. Consider the total cost (total cost = 100 newspaper+3 jeans+1 apartment) is the NPV of project. Draw the sensitivity diagram for the three major variables. Include important calculations and discussion on the results.

(2) If the NPV = 3(jeans) 2 + (apartment)(newspaper), redo the questions in (1).

(3) Use the established distribution histogram (function) to draw sensitivity diagram with 30% and 70% probability contours. Include important calculations and discussion on the results.

Q2)

A developer is planning an outlet shopping center. At the project appraisal stage, two contract methods are under consideration: 1. Design-building (DB) approach, 2. Design-bidbuild (DBB) approach. Predicted 12 year cash flows for the construction phase and operation phase of this project is listed in Table 1 for those two optional contract methods. For DB approach, the construction will only take 2 years but cost more. For the DBD approach, the construction will take 3 year but cost less. The developer is evaluating the performance of the project in a 12 year window by using the NPV.

Table 1: Cash flow (unit $M)

year 1 2 3 4 5 6 7 8 9 10 11 12
DB -3 -5 0 1 1 1 1.2 1.2 1.3 1.3 1.3 1.5
DBB -1 -3.5 -3 0 1 1 1.2 1.2 1.3 1.3 1.3 1.5

(1) Calculate the NPV for those two contract methods, and identify the construction method of choice for the developer. (Assume rate of return is 5%)

(2) The increase in construction cost (cash flow) and the decrease in profit in the operation phase can be two risks that the developer shall consider. Plot sensitive analysis results for those two risks cost for the construction method of choice in problem (1). Show detail calculations. (Hint: for the sensitive plot, the y-axis should be the % change in NPV, x-axis should be % change in risks. You can assume the changing percentage in cash flow is same for each year during the construction and the operation phases. The sensitive curves for the two risks may not be linear, therefore you need to plot multiple points, then connect them to form the curve)

(3) Assume the construction cost increase follows a triangle probability distribution (0, 5%, 10%), and the profit decrease follows a uniform probability distribution (-5%, 5%), as shown below. Draw the sensitive curves with 25% probability contour.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Cost Accounting A Decision Emphasis

Authors: Germain Boer, Debra Jeter

5th Edition

0759341559, 978-0759341555

More Books

Students also viewed these Accounting questions