Q1. Table Q1 shows the cost of works and the program for the construction of abuilding. The information's of the project are as the followings:

image text in transcribed

Q1. Table Q1 shows the cost of works and the program for the construction of abuilding. The information's of the project are as the followings: The gross profit margin is 15% of the cost (i) (ii) Retention money is 5 % (iii) (iv) Progress payment is on monthly basis and measurement will be made at the end of each month with payment delay of one (1) month. The retention money is repaid 3 (three) months after the practical completion. To simplify the calculation, you may assume that all costs must be met at the instant they are incurred. You may also assume that the monthly value and cost for each activity are equally distributed Total Cost OfWork(RM X 1000) Activity Duration Predecessor Start 0 A A 2 2 2 Start A(SS+1) 600 700 B c B D 4 300 1200 800 E C(FS-3) C(FS-1) E 2 2 F 1000 G 1 1500 1 500 H Finish D. F, G H 0 Based on the above information's, answer the following questions. (1) Calculate the maximum cash required for this project. (ii) (iii) At the end of which |month, the maximum cash is required? What is the expected monthly payment received of all works that arescheduled to be completed in the fifth month? Propose three (3) methods how the maximum cash requirement for theabove project can be reduced. Without rescheduling all payment to supplier and subcontractor calculate how much the maximum cash requirement can be reduced (iv) (v) Q1. Table Q1 shows the cost of works and the program for the construction of abuilding. The information's of the project are as the followings: The gross profit margin is 15% of the cost (i) (ii) Retention money is 5 % (iii) (iv) Progress payment is on monthly basis and measurement will be made at the end of each month with payment delay of one (1) month. The retention money is repaid 3 (three) months after the practical completion. To simplify the calculation, you may assume that all costs must be met at the instant they are incurred. You may also assume that the monthly value and cost for each activity are equally distributed Total Cost OfWork(RM X 1000) Activity Duration Predecessor Start 0 A A 2 2 2 Start A(SS+1) 600 700 B c B D 4 300 1200 800 E C(FS-3) C(FS-1) E 2 2 F 1000 G 1 1500 1 500 H Finish D. F, G H 0 Based on the above information's, answer the following questions. (1) Calculate the maximum cash required for this project. (ii) (iii) At the end of which |month, the maximum cash is required? What is the expected monthly payment received of all works that arescheduled to be completed in the fifth month? Propose three (3) methods how the maximum cash requirement for theabove project can be reduced. Without rescheduling all payment to supplier and subcontractor calculate how much the maximum cash requirement can be reduced (iv) (v)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Consumer And Personal Finance Activities Book Economics Concepts And Choices

Authors: Mcdougal Littell

1st Edition

0618822887, 9780618822881

More Books

Students also viewed these Finance questions