Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Q3(30) A 400-V DB supplies 30kVA load at PF=0.95 lag. The cable is non-armoured and multicore. The cable is installed first in metallic conduit clipped

image text in transcribed

Q3(30) A 400-V DB supplies 30kVA load at PF=0.95 lag. The cable is non-armoured and multicore. The cable is installed first in metallic conduit clipped direct on wall surface along its first run (1) and then is installed in PVC conduit embedded in building materials. The length of each cable run is given on the figure. If the ambient temperature is 42C for both runs, determine the voltage across the terminals of the load. (1) 25m (2) 19m L DB

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Students also viewed these Databases questions