QUAL 8 3 4 6 Observation Guide v 1 . 5 Canadian Coffee Roasters Ltd ( CCR ) has contacted you, a Production Specialist, requesting
QUAL Observation Guide v
Canadian Coffee Roasters Ltd CCR has contacted you, a Production Specialist, requesting that you draft a value stream
map VSM for their facility so that they can better understand their current throughput and operational performance.
This is a brandnew production facility that this organization has custom built to meet the demand of a new highvolume
customer. Before the facility was developed, an Analyst team sat down and calculated the exact yield and machinery
needed to meet the customers needs. However, after a few weeks of operation, there appears to be a discrepancy in the
required production quantity and the projected productions levels. You have been called in to verify the work of the
Analyst team and determine if they made an error in their calculations.
Unable to physically access the facility, you opted to send your trusted coworker, Billy Bob, to observe and document the
process as it is completed. During Mr Bobs time in the facility, he decided to take a series of photos and fillout his
comments directly next to the captured images to communicate the process more effectively. Unfortunately, Mr Bob
wasnt familiar with how to format his comments to align to the proper terminology of VSM and has instead written a
series of comments for you to distill the information from. The information included has not been written in a cryptic
way, the values may simply be presented in a less than desirable unit type for which you will need to translate or
standardize them
Onsite Observations:
Unit:
When processed, the coffee beans are referred to as a 'unit' of production. The exact measurement was Kg of coffee
beans postprocessing per unit. Therefore, each time a 'unit' is processed, exactly Kg of coffee beans were processed.
Facility:
Number of shifts per day:
Availability: hours per shift minute time loss to breaks per shift
Batch Size: units
Average Demand: units day
Weekly Demand: units day days
Raw materials supplier receives a monthly sales order through online order form from our facility and takes days to
ship the order from the supplier to the manufacturing facility.
Process Step : Hulling
Two operators are required to run the coffee bean hulling machine.
The machine can process exactly units per hour.
As the machine requires recalibration and a thorough cleaning
between usage, the resultant setup time is minutes between units.
Due to the simplistic nature of this machine, there is an observed
up time.
Before passing to Process Step : cleaning approximately units
must be stored in inventory WIP
Hint: Normalize all time values to seconds and calculate the Per
Unit Processing Time Cycle Time Setup Time
Process Step : Cleaning
Two operators run the filtration basins. Each coffee bean unit is
added to a large filtration device that uses long paddles to spin the
hulled coffee beans, pushing debris and dust off. The unusable
materials will filter through the large mesh sifter base leaving only
cleaned beans that automatically exit the filtration basin into an
attached storage container. For the purposes of this assessment, we
will assume that Kg of product is still the yield per unit. The
filtration device is rated to process Kg of coffee beans per hour.
Hint calculate UNITS how many kg per unit can be processed
each hour.
However, due to the machine becoming clogged with debris,
resulting in the necessity of frequent cleaning, the rated UpTime of
this machine is only observed to be Additionally, loading a unit
of beans Setup Time into the hopper took seconds for each unit.
Before passing to Process Step : Grading Kg of product must
be processed. Hint convert Kg to units for WIP
Process Step : Grading
Each unit of coffee must next be placed through a grading device that
will test for acidity, oil consistency and flavonoids. Each unit takes
precisely minute to process with a setup time of seconds per unit.
However, as this device works on compression and heat, the
observed uptime is only and is managed tended by operator.
Kgs of coffee must be graded WIP before we can proceed to
Process Step : Roasting.
Process Step : Roasting
Mr Bob requested support from the coffee roaster on how to fill out
this section. These are the values as reported by the roaster who just
so happened to be a former VSM Expert
Cycle Time Seconds per unit
Throughput seconds per min seconds per unit units
per minute
Setup Time Seconds per unit
Per unit processing time seconds seconds seconds
UpTime hours @ eff seconds
Operator
WIP units
Process Step : Packaging
The final step in the process is heavily automated, re
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started