Question
Quality Associates, Inc., a consulting firm, advises its clients about sampling and statistical procedures that can be used to control their manufacturing processes. In one
Quality Associates, Inc., a consulting firm, advises its clients about sampling and statistical procedures that can be used to control their manufacturing processes. In one particular application, a client gave Quality Associates a sample of 800 observations taken while that client's process was operating satisfactorily. The sample standard deviation for these data was 0.21; hence, with so much data, the population standard deviation was assumed to be 0.21. Quality Associates then suggested that random samples of size 30 be taken periodically to monitor the process on an ongoing basis. By analyzing the new samples, the client could quickly learn whether the process was operating satisfactorily. When the process was not operating satisfactorily, corrective action could be taken to eliminate the problem. The design specification indicated that the mean for the process should be 12. The hypothesis test suggested by Quality Associates is as follows:
H H
:1 2 :1 2
0
a
m m
5
Corrective action will be taken any time H0 is rejected. The samples listed in the following table were collected at hourly intervals during the first day of operation of the new statistical process control procedure. These data are available in the file Quality.
Sample 1 Sample 2 Sample 3 Sample 4 11.55 11.62 11.91 12.02 11.62 11.69 11.36 12.02 11.52 11.59 11.75 12.05 11.75 11.82 11.95 12.18 11.90 11.97 12.14 12.11 11.64 11.71 11.72 12.07 11.64 11.71 11.72 12.07 11.80 11.87 11.61 12.05 12.03 12.10 11.85 11.64 11.94 12.01 12.16 12.39 11.92 11.99 11.91 11.65 12.13 12.20 12.12 12.11 12.09 12.16 11.61 11.90 11.93 12.00 12.21 12.22 12.21 12.28 11.56 11.88 12.32 12.39 11.95 12.03 11.93 12.00 12.01 12.35 11.85 11.92 12.06 12.09 11.76 11.83 11.76 11.77 12.16 12.23 11.82 12.20 11.77 11.84 12.12 11.79 12.00 12.07 11.60 12.30 12.04 12.11 11.95 12.27 11.98 12.05 11.96 12.29 12.30 12.37 12.22 12.47 12.18 12.25 11.75 12.03 11.97 12.04 11.96 12.17 12.17 12.24 11.95 11.94 11.85 11.92 11.89 11.97 12.30 12.37 11.88 12.23 12.15 12.22 11.93 12.25
1. Conduct a hypothesis test for each sample at the 0.01 level of significance and
determine what action, if any, should be taken. Provide the test statistic and p value foreachtest. 2. Compute the standard deviation for each of the four samples. Does the conjecture of 0.21 for the population standard deviation appear reasonable? 3. Compute limits for the sample mean x around 12 m 5 such that, as long as a new sample mean is within those limits, the process will be considered to be operating satisfactorily. If x exceeds the upper limit or if x is below the lower limit, corrective action will be taken. These limits are referred to as upper and lower control limits for quality-control purposes. 4. Discuss the implications of changing the level of significance to a larger value. What mistake or error could increase if the level of significance is increased? Can you Please show in excel how you get the answers, Thanks.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started