Answered step by step
Verified Expert Solution
Link Copied!

Question

...
1 Approved Answer

Quantity: Flooding and Sight Distance Important Terminology Station: 100 feet. Projects start at station 0+00 Stations are written as the number of hundreds + remaining.

Quantity: Flooding and Sight Distance

Important Terminology

  • Station: 100 feet.
    • Projects start at station 0+00
    • Stations are written as the number of hundreds + remaining. Ex: The first station is 1+00 and the second station would be written as 2+00.
    • If you are 11+ 62.5 stations from the start of a project, you are 1162.5 feet from the start of the project.
  • Slope: (use feet for horizontal distance)
  • Grade: (use stations for horizontal distance)
    • 3% grade means for every 100 feet horizontal, the rise in the road is 3 feet vertically
    • 3% = .03, but using stations would be reported at a grade of 3

Civil Engineers at NCDOT measure using stations instead of feet. From Crests and Sags part 1, you determined that the curve elevation function for the 400-foot vertical curve (horizontal width) with a beginning grade of

-5.1% and ending grade is 2.4% is where x is in horizontal feet.

  1. Use the formula , to determine value of a in stations.

  1. Rewrite the equation where x is in stations.

  1. Rewrite the following horizontal distances in feet to stations. Then use the stations and the equation you found from #2, to determine the elevations of the curve.

Horizontal Feet

Stations

Vertical Elevation

0 feet

50 feet

100 feet

150 feet

175 feet

200 feet

225 feet

250 feet

300 feet

350 feet

400 feet

  1. Suppose in thisscenario thestormwater drop is placed 1.4 stations from the VPC.
    1. Explain why this is not optimal placement for the stormwater drop.

  1. Where should thestormwater drop be placed for optimal roadway drainage? Determine the elevation for the appropriate storm drain placement.

  1. During a hurricane event, the model predicts stormwater will rise to an elevation of 109.00 feet. Determine the interval, in stations, in which the roadway floods.

  1. Why do you think the roadway will still flood even though the drain is at its optimal location for roadway drainage? What other factors may be contributing to the flooding issues?

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Statistics Unlocking The Power Of Data

Authors: Robin H. Lock, Patti Frazer Lock, Kari Lock Morgan, Eric F. Lock, Dennis F. Lock

1st Edition

9780470601877

Students also viewed these Physics questions