Question: Question 1 (30 marks) A comprehensive need assessment was conducted by the ABC Construction Company Ltd, and decided to construct a Net Zero Home. A

 Question 1 (30 marks) A comprehensive need assessment was conducted by

Question 1 (30 marks) A comprehensive need assessment was conducted by the ABC Construction Company Ltd, and decided to construct a Net Zero Home. A plot of land was selected to develop the net-zero home, which is No 264, Upper lake drive, Kelowna, BC. At the initial stage of the project, the project team can make some assumptions based on the available literature (need to indicate those literature) and develop initial planning work. 1. The project charter needs to be developed in order to assign a project manager and to assume project activities. You are asked to develop the project charter for the above project by the CEO of the company. Please develop the project charter and indicate your own assumptions and constraints. (2 marks) 2. Consider you are being appointed as the project manager of this project to proceed with the rest of the project planning work. a. Identify different project stakeholders (at least up to 10 stakeholders) and their characteristics (2 marks) b. Classify stakeholders using positive and negative classification method (2 marks) 3. The following specifications were collected via stakeholder requirement gathering that will be used to develop the scope statement of the project. Home specifications: The net-zero home has to be 2 story that needs to have 3-bed rooms, 3-bath rooms, and a media room. Altogether the total heated floor area should be less than 3000 sq.ft including the mechanical room. Building front orientation will be North West and comes with a swimming pool and lake view Heating Cooling and ventilation system: The home primary heating system will be ground-source heat pumps and the secondary heating system will be natural gas heating system with electric space cooling system. Domestic Hot water system: Heat-pump based hybrid water heating system will be used to fulfill household hot water requirement. Home superstructure: 2" rigid insulation & 2x4 Framing Filled with R14 Batt insulation. Windows od betale mamasad266 ansamblodhitheamchasiers Question 1 (30 marks) A comprehensive need assessment was conducted by the ABC Construction Company Ltd, and decided to construct a Net Zero Home. A plot of land was selected to develop the net-zero home, which is No 264, Upper lake drive, Kelowna, BC. At the initial stage of the project, the project team can make some assumptions based on the available literature (need to indicate those literature) and develop initial planning work. 1. The project charter needs to be developed in order to assign a project manager and to assume project activities. You are asked to develop the project charter for the above project by the CEO of the company. Please develop the project charter and indicate your own assumptions and constraints. (2 marks) 2. Consider you are being appointed as the project manager of this project to proceed with the rest of the project planning work. a. Identify different project stakeholders (at least up to 10 stakeholders) and their characteristics (2 marks) b. Classify stakeholders using positive and negative classification method (2 marks) 3. The following specifications were collected via stakeholder requirement gathering that will be used to develop the scope statement of the project. Home specifications: The net-zero home has to be 2 story that needs to have 3-bed rooms, 3-bath rooms, and a media room. Altogether the total heated floor area should be less than 3000 sq.ft including the mechanical room. Building front orientation will be North West and comes with a swimming pool and lake view Heating Cooling and ventilation system: The home primary heating system will be ground-source heat pumps and the secondary heating system will be natural gas heating system with electric space cooling system. Domestic Hot water system: Heat-pump based hybrid water heating system will be used to fulfill household hot water requirement. Home superstructure: 2" rigid insulation & 2x4 Framing Filled with R14 Batt insulation. Windows od betale mamasad266 ansamblodhitheamchasiers

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Finance Questions!