QUESTION 1 A wow bypass is planned to connect Cultowwe directly to US 74 at Balsam. The project is expected to require 407,000 cy of excavation to be hauled to be hauled offsite and placed in a waste area. Soil testing has indicated the following unit weights Bank 102 pc! Loose 84 pcr Compacted 119 per The contractor has agreed with the owner of the west to property to pay of $0.06 por cubie yard of embankment bolt on the Estimate (to nearest 80.01, the cost paid to the landowner for wasting the material on their property QUESTION 2 A new typass is planned to cornect Culownee inacty to US 74 at Batsom. The project copected to require 467,000 cy of excavation to be hauled to be hauled off-site and placed in a waste aron Soil testing has indicated the following unit weights Bank 101 pc Loose 82 pd Compacted 119 pcf the contractor plans to use 32cy capocry articulated how trucks to move me material Estimate the number of trucks loads (to the nearest whole number that must be hauled from the site. QUESTION 1 A wow bypass is planned to connect Cultowwe directly to US 74 at Balsam. The project is expected to require 407,000 cy of excavation to be hauled to be hauled offsite and placed in a waste area. Soil testing has indicated the following unit weights Bank 102 pc! Loose 84 pcr Compacted 119 per The contractor has agreed with the owner of the west to property to pay of $0.06 por cubie yard of embankment bolt on the Estimate (to nearest 80.01, the cost paid to the landowner for wasting the material on their property QUESTION 2 A new typass is planned to cornect Culownee inacty to US 74 at Batsom. The project copected to require 467,000 cy of excavation to be hauled to be hauled off-site and placed in a waste aron Soil testing has indicated the following unit weights Bank 101 pc Loose 82 pd Compacted 119 pcf the contractor plans to use 32cy capocry articulated how trucks to move me material Estimate the number of trucks loads (to the nearest whole number that must be hauled from the site