Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Question 1 DEMAND (CBM) DISTANCES WAREHOUSE AVERAGE MILES FROM KANSAS CITY MILES FROM LOS ANGELES MILES FROM SEATTLE Kansas City 20,960 0 1,540 1,890 Cleveland

Question 1

DEMAND (CBM) DISTANCES
WAREHOUSE AVERAGE MILES FROM KANSAS CITY MILES FROM LOS ANGELES MILES FROM SEATTLE
Kansas City 20,960 0 1,540 1,890
Cleveland 17,180 800 2,260 2,530
Newark 24,790 1,200 2,670 2,820
Jacksonville 15,180 1,140 2,530 2,920
Chicago 22,760 450 1,930 1,920
Greenville 15,180 850 2,430 2,920
Memphis 17,180 440 1,840 2,270
Dallas 22,760 430 1,490 2,170
Los Angeles 34,160 1,540 0 1,070
Total 190,150

Although a high percentage of demand was from warehouses either south or east of Kansas City, the question has surfaced concerning the 34,160 CBM (approximately 18 percent of the total volume) that will be shipped to Kansas City and then shipped back to the Los Angeles warehouse. This double-transportation could potentially be eliminated if a new distribution center were built in Los Angeles. The idea might be to ship material arriving at the Seattle port by rail to a new Los Angeles distribution center, which would be located at the current location of the Los Angeles warehouse.

It is estimated that the Los Angeles facility could be upgraded at a one-time cost of $1,500,000 and then operated for $350,000 per year. In the new Los Angeles distribution center, containers would be unloaded and processed through a quality assurance check, just as is now done in Kansas City. The variable cost for doing this would be $8.00 per CBM processed, which includes the cost to move the containers from the Los Angeles port to the distribution center.

After the material is processed in Los Angeles, the amount needed to replenish the Los Angeles warehouse (34,160 CBM per year on average) would be kept and the rest sent by rail to Kansas City. It would then be directly stocked in the Kansas City distribution center and used to replenish the warehouses. They expect that very little would need to be shipped back to the Los Angeles warehouse after the new system was operating for about six months.

Grainger management feels that it may be possible to make this change, but they are not sure if it would actually save any money and whether it would be a good strategic change.

*The data in this case have been developed for teaching purposes and do not represent the actual situation at Grainger. The data, though, are representative of an actual problem that Grainger and similar companies must address to efficiently run the supply chain.

Relative to the U.S. distribution network, calculate the cost associated with running the existing system. Assume that 40 percent of the volume arrives in Seattle and 60 percent in Los Angeles and the port processing fee for federal processing at both locations is $8.00 per CBM. Assume that everything is transferred to the Kansas City distribution center by rail, where it is unloaded and quality checked. Assume that all volume is then transferred by truck to the nine existing warehouses in the United States

Question 2

Problem 15-7 (Algo)

Bindley Corporation has a one-year contract to supply motors for all washing machines produced by Rinso Ltd. Rinso manufactures the washers at four locations around the country: New York City, Fort Worth, San Diego, and Minneapolis. Plans call for the following numbers of washing machines to be produced at each location:

New York City 20,000
Fort Worth 100,000
San Diego 80,000
Minneapolis 95,000

Bindley has three plants that can produce the motors. The plants and production capacities are

Boulder 100,000
Macon 150,000
Gary 80,000

Due to varying production and transportation costs, the profit Bindley earns on each 1,000 units depends on where they were produced and where they were shipped. The following table gives the accounting department estimates of the dollar profit per unit. (Shipment will be made in lots of 1,000.)

SHIPPED TO
PRODUCED AT NEW YORK CITY FORT WORTH SAN DIEGO MINNEAPOLIS
Boulder 15 21 21 25
Macon 29 26 16 7
Gary 8 22 23 21

Given profit maximization as a criterion, Bindley would like to determine how many motors should be produced at each plant and how many motors should be shipped from each plant to each destination.

a.Develop a transportation grid for this problem.

Question 3

Your company assembles five different models of a motor scooter that is sold in specialty stores in the United States. The company uses the same engine for all five models. You have been given the assignment of choosing a supplier for these engines for the coming year. Due to the size of your warehouse and other administrative restrictions, you must order the engines in lot sizes of 1,400 units. Because of the unique characteristics of the engine, special tooling is needed during the manufacturing process forwhich you agree to reimburse the supplier. Your assistant has obtained quotes from two reliable engine suppliers and you need to decide which to use. The following data have been collected:

Requirements (annual forecast) 16,600 units
Weight per engine 30 pounds
Order processing cost $ 180 per order
Inventory carry cost 20 percent of the average value of inventory per year

Note:Assume that half of lot size is in inventory on average (1,400/2 = 700 units).

Two qualified suppliers have submitted the following quotations:

ORDER QUANTITY SUPPLIER 1 UNIT PRICE SUPPLIER 2 UNIT PRICE
1 to 1,499 units/order $ 478 $ 480
1,500 to 2,999 units/order 480 485
3,000 + units/order 480 475
Tooling costs $ 30,000 $ 26,500
Distance 120 miles 100 miles

Your assistant has obtained the following freight rates from your carrier:

Truckload (53,500 lbs. each load): $0.80 per ton-mile
Less-than-truckload: $1.20 per ton-mile

Note:Per ton-mile = 2,000 lbs. per mile.

a-1.Calculate the total cost for each supplier.

b-.If you could move the lot size up to ship in truckload quantities, calculate the total cost for each supplier.(Do not round intermediate calculations.Round"Required lot size for truckload" andfinalanswers to the nearest whole number.)

HINT: Use (full) truckload cost rates and the lowest (feasible) unit cost for all calculations. For example, if there are 8.3 orders per year, don't split the 8.3 orders into 8 full truckloads and 0.3 less-than-truckloads - use the full truckload rate for all 8.3 orders. For annual purchase cost, don't use two different unit costs for the 8 complete orders and the 0.3 partial orders - use the lowest (feasible) unit cost for all 8.3 purchase orders based on the lot size needed for a full truckload.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Operations And Supply Chain Management The Core

Authors: F. Robert Jacobs, Richard Chase

5th Edition

1260238881, 9781260238884

More Books

Students also viewed these General Management questions