Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Question 2 A manual assembly line is to be designed to make a small consumer product. The work elements, their times, and precedence constraints are

Question 2
A manual assembly line is to be designed to make a small consumer product. The work
elements, their times, and precedence constraints are given in the table below. The workers
will operate the line for 400 min per day and must produce 300 products per day. A
mechanized belt, moving at a speed of 1.25 m/min, will transport the products between
stations. Because of the variability in the time required to perform the assembly operations,
it has been determined that the tolerance time should be 1.5 times the cycle time of the line.
2.1.1 Construct the precedence diagram (10)
2.1.2 Determine the ideal minimum number of workers (1)
2.1.3 Use the Largest Candidate Rule method to balance the line. (10)
2.1.4 Compute the balance delay for your solution in 1.1.3.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these General Management questions