Question 20 12 pts You are planning an excavation activity using a hydraulic excavator with a bucket capacity of 3 CY and a maximum
Question 20 12 pts You are planning an excavation activity using a hydraulic excavator with a bucket capacity of 3 CY and a maximum digging depth of 25 feet. The material for this excavation is a well blasted rock giving a bucket fill factor of 75% and a swell percent of 60%. The swing angle is 50 and the average depth of the cut is 14 feet. The cost of the excavator and operator is $170/hr and on this operation a 45 minute hour is anticipated. The standard cycle times (including adjustment for dumping into a truck) for this machine are as follows: Load time - 7 seconds Swing loaded time - 6 seconds Dump bucket - 5 seconds Swing empty - 4 seconds What is the cost per Bank Cubic Yard to excavate this material? Round your answer to the nearest thousandth.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started