Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Question 30 The Allbright BrickWorks, in Winnipeg, manufactures high-quality bricks used in residential and commercial construction. The firm is small but highly automated and typically

image text in transcribed

Question 30 The Allbright BrickWorks, in Winnipeg, manufactures high-quality bricks used in residential and commercial construction. The firm is small but highly automated and typically produces about 300,000 bricks per month. A brick is created in a continuous production operation. In the initial step, the raw material, a mixture of soils and water, is forced into a brick mould moving along a conveyer belt. No other materials are required in the manufacture of a brick. Each brick takes about three days to complete. They spend the last 36 hours or so on the conveyor belt in an oven that remaves moisture from the product. The conveyor belt speed is monitored and controlled by computer. The firm uses a process costing system based on actual costs in three cost pools-direct materials, direct labour, and factory overhead-to assign production costs to output. Cost and production data for October 2020 follow: Production Data Beginning work in process inventory (100% complete in terms of direct materials, 60% complete in terms of direct labour; 36% complete in terms of factory overhead) Started this period 36,000 bricks 290,700 bricks Ending work in process inventory (100% complete in terms of direct materials; 50% complete in terms of direct labour; 40% complete in terms of factory overhead) 35,600 bricks Cost Data Beginning inventory Cost in October Materials Direct Labour Overhead $820 14,619 $410 14,365 $1,320 11,628 Determine the cost of bricks transferred to finished goods inventory and the cost of bricks in ending work in process inventory for October 2020. Assume the company uses the FIFO method. (Round answers to the nearest whole dollar, e.g. 5,275. Round per unit costs to the 4 decimal places, e.g. 15.2512.) Cost of bricks transferred to finished goods inventory Cost of bricks in ending work in process inventory

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions