Question 4 Activity Table: Activity Pessimistic Most likely Optimistic Immediate duration duration duration Predecessors (in days) (in days) (in days) A 3 5 3 4.5
Question 4 Activity Table: Activity Pessimistic Most likely Optimistic Immediate duration duration duration Predecessors (in days) (in days) (in days) A 3 5 3 4.5 9 IN 3 4 4 6 A,B AN 7 16 B.C 1 1.5 5 E 2.5 3.5 7.5 D 3 E +- 6 F.I W WUIN 1.5 4.5 F,H - 5 G,I,J The PERT estimation procedure uses pessimistic, most likely, and optimistic estimates of the activity time to obtain the expected value and the standard deviation for each activity. The standard deviation is required only if the analyst wishes to make probability statements about completing the project by a certain date. Using the inputs listed above: 1. Create the network diagram using the PERT method to calculate the estimated duration for each activity; (8 marks) 2. Calculate the critical path; (4 marks) 3. Calculate the minimum expected time in which the project can be completed; (5 marks) 4. Show slack values for each activity, together with the latest expected time that any activity can start (or finish) without delaying the project; and
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started