Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Question 4 AL (25 Marks) You are the Team Lead of a Consultant building a multi-use facility. The facility consists of 150 residential buildings,

Question 4 AL (25 Marks) You are the Team Lead of a Consultant building a multi-use facility. The facility consists of 150 residential buildings, a football park, a commercial area, 2.5km of all- weather roads with adjoining roads. a. The designs for all structures have been completed and reviewed to ensure that the standards and the Clients brief are totally complied with. The Bill of Quantities for the whole the works have also been developed based on the drawings and specification. Advice your team on the best method of measurement to be adopted to prepare the Bill of Quantities and used for valuing work on completion. AP (8 Marks) b. A completed Tender Document submitted by the Contractor, Construtora Quieroz Galvao. The Conditions of Contract in use was the FIDIC for EPC/TurnKey Projects 1989. C. In the Tender Document and the Appendix to Tender, payment period is 36 days. However, in the Conditions of Particular Application the payment period has been stated as 120 days. Discuss the relation between the Tender Document, the Conditions of Contract and the Conditions of Particular Application during contract administration and explain how the discrepancy can be resolved. The drawing below is a typical drain to be constructed on a site. 7 Determine the volume of excavation to be paid in the drawing below. The Length of the drain is 100m long. LUL 0.75m 0.9m 6. AP (7 Marks) 0.7m d. Discuss the with reference to the CESMM3 the appropriate rule in the works classification based on which the above 4 (C) computation was done. m UN (5 Marks) UN (5 Marks)

Step by Step Solution

3.46 Rating (156 Votes )

There are 3 Steps involved in it

Step: 1

Data 450 residential buidings 25 K 8X A X O X ... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Mechanics of Materials

Authors: James M. Gere, Barry J. Goodno

7th edition

495438073, 978-0495438076

More Books

Students also viewed these Civil Engineering questions