Question 5 : Suqqested Time - 1 0 minutes ( CO 2 / PO 2 / C 3 - 5 % ) An engine production
Question : Suqqested Time minutes COPOC
An engine production line has milling machines with reliabilities of and respectively. The production line was designed in a way that if one of the machines is malfunctions, the line will shut down. To increase the line's reliability, En Abu who is the maintenance engineer has considered two designs options. Option is to add an identical backup line and Option is to provide a backup for each machine. The reliability of machine is similar, while machines and are and respectively.
Choose the best plan that will provide higher reliability. Next, explain the reason of two reliabilities is not the same.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started