question 7 please. labor cost per period if possible
3. Using the provided simple WBS (below) develop a network project diagram. a. Assume a Jan 1, 2020 start date b. The duration is in days. 4. What is the projected completion date? 5. What are the critical path(s) for the project? 6. How would you assess the level of risk in the project? 7. Extra Credit (up to 3 points). Using the provided simple WBS (below) show the labor cost per period. a. The annual rates for the names are in the case b. What is the total project labor cost? 1.2 1.4 1.5 1.6.1 1.6.2 1.6.3 1.6.4 1.7 1.8.1 182 1.83 Task Name Determine System Requirements Determine Software Requirements Detailed Design Test Planning Create Development Environment Create Testing Environment Support Development Environment Support Testing Environment and Deployment Develop and Unit Test System Perform Assembly Testing Perform System Testing Perform Validation Testing Deploy System Wrap up Project Duration Predecessors 13 22 1.2 24 1.3 46 1.3 20 1.2 38 1.6.1, 1.62 38 1.6.1 46 1.6.2, 1.6.3 38 1.4, 1.6.1 23 1.7 20 1.5, 1.8.1 10 1.82 Resources Ryan Neff (functional Law Stacy Lyle (Function Analys Ryan Neft Functional Lead Marc Sanders Development Lead) Paniff Functional Load) (50%). Developer Kara Sposki (TestLead) Todd Bon Tester) Pek Burke (Infrastructure Lead Rock Burko (Infrastructure Lead) Rek Burke (Infrastructure Lend) Fock Burke (Infrastructure Load) Developer 2 Marc Sanders Development Lead) Kara Soo (Tent Leads,Todd Blason (Tester) Mwe Sanders (Development Lead) Kivo Sicos (Test Lond), Todd Bon Tower) Marc Sanders Development Lead) Kara Soosk Test Lead), Todd Blason Tester) Kara Spoti (Test Lead). Todd Blon Tester) Siders (Development Lead) Developer (TBD) Dope Developer Kara Sipos (Testled), Todd Baron (Te). Sanders (Development Lead Developer TBD). Dieper 1 Deva 1.9 11 1.6.4, 1.8.3 1.9 1.9.3 10 3. Using the provided simple WBS (below) develop a network project diagram. a. Assume a Jan 1, 2020 start date b. The duration is in days. 4. What is the projected completion date? 5. What are the critical path(s) for the project? 6. How would you assess the level of risk in the project? 7. Extra Credit (up to 3 points). Using the provided simple WBS (below) show the labor cost per period. a. The annual rates for the names are in the case b. What is the total project labor cost? 1.2 1.4 1.5 1.6.1 1.6.2 1.6.3 1.6.4 1.7 1.8.1 182 1.83 Task Name Determine System Requirements Determine Software Requirements Detailed Design Test Planning Create Development Environment Create Testing Environment Support Development Environment Support Testing Environment and Deployment Develop and Unit Test System Perform Assembly Testing Perform System Testing Perform Validation Testing Deploy System Wrap up Project Duration Predecessors 13 22 1.2 24 1.3 46 1.3 20 1.2 38 1.6.1, 1.62 38 1.6.1 46 1.6.2, 1.6.3 38 1.4, 1.6.1 23 1.7 20 1.5, 1.8.1 10 1.82 Resources Ryan Neff (functional Law Stacy Lyle (Function Analys Ryan Neft Functional Lead Marc Sanders Development Lead) Paniff Functional Load) (50%). Developer Kara Sposki (TestLead) Todd Bon Tester) Pek Burke (Infrastructure Lead Rock Burko (Infrastructure Lead) Rek Burke (Infrastructure Lend) Fock Burke (Infrastructure Load) Developer 2 Marc Sanders Development Lead) Kara Soo (Tent Leads,Todd Blason (Tester) Mwe Sanders (Development Lead) Kivo Sicos (Test Lond), Todd Bon Tower) Marc Sanders Development Lead) Kara Soosk Test Lead), Todd Blason Tester) Kara Spoti (Test Lead). Todd Blon Tester) Siders (Development Lead) Developer (TBD) Dope Developer Kara Sipos (Testled), Todd Baron (Te). Sanders (Development Lead Developer TBD). Dieper 1 Deva 1.9 11 1.6.4, 1.8.3 1.9 1.9.3 10