Answered step by step
Verified Expert Solution
Question
1 Approved Answer
QUESTION The figure below shows the pressure prognosis for a well under planning. The open hole below the surface casing shoe is planned to
QUESTION The figure below shows the pressure prognosis for a well under planning. The open hole below the surface casing shoe is planned to reach 10,000 ft. Given: Pore pressure gradient: 0.45 psi/ft Fracture pressure gradient: 0.8 psi/ft Depth 10,000 ft Reservoir gas gradient: 0.1 psi/ft 4,500 psi 8,000 psi a) Determine the minimum depth of the surface casing in order to get full well integrity, i.e., the formation below the shoe will NOT fracture if the well is full of gas. Ans. = 5,000 ft Pressure
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started