QUESTION TWO: ( 2 0 MARKS ) As a Chief engineer, you neod to come up with the cash flow estimate for a newly proposed

QUESTION TWO: (20 MARKS)
As a Chief engineer, you neod to come up with the cash flow estimate for a newly proposed
production line. Initially, the system is designed to have a maximum capacity (Cmax) of six
million parts to produce per year, but the demand is expected to grow at an annual compound
rate of 10%. Whenever the annual demand reaches 80% of the maximum designed capacity,
the maximum designed capacity must be doubled in the subsequent ycar. The cost of meeting
these future demands, as well as other projected financial data, are as follows:
Cost of building the production system as a function of maximum designed capacity:
1.5M+0.5(Cmax)0.7.
Initial demand =3 million parts per year.
Demand growth rate =10% per year.
Project life =15 years.
Revenucs per year = demand during year n(5)1.05.
Expenses per year =$12,000+ demand during year n(2)1.08.
Estimate the project cash flows over the project life. Tabulate your results

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

The Strategy Driven Supply Chain

Authors: Bram DeSmet

1st Edition

1398600458, 978-1398600454

More Books

Students also viewed these General Management questions

Question

What are the major principles of social marketing?

Answered: 1 week ago

Question

6 How would you determine the accuracy of a proposed forecast?

Answered: 1 week ago