Raaste Ka Raja (RKR) Inc. manufactures two products: car wheels and truck wheels. To determine the amount of overhead to assign to each product line,
Raaste Ka Raja (RKR) Inc. manufactures two products: car wheels and truck wheels. To determine the amount of overhead to assign to each product line, the controller has developed the following information.
Estimated Wheel Products
Direct Labour Hours per Wheel
Car
40,000
1.5
Truck
10,000
3.0
Total estimated overhead costs for the two product lines are $840,000.
a. Compute the overhead cost assigned to the car wheels and truck wheels, assuming that direct labor hours is used to allocate overhead costs. [4 Marks] The controller is not satisfied with the traditional method of allocating overhead. He therefore develops the following three activity cost pools and related cost drivers to better understand these costs. Activity cost pools
Setting up machines
Inspector
Expected use of cost drivers
1,200 setups
90,000 labor hours
1.000 inspections
Estimated overhead costs
$276,000
5300,000
5264.000
Compute the activity-based overhead rates for these three cost pools. [3 marks]
Calculate the overhead cost assigned to the car wheels and truck wheels product lines using an activity-based costing system on the basis of the following information -
[4 marks]
Expected Use of Cost Drivers Per Product
Car
Truck
[Number of setups
Direct labor hours
[Number of inspections
d. What do you believe the controller should do? [1 mark]
400
60,000
500
800
30,000
500
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started