There are three factories on the Momiss River. Each emits two types of pollutants, labeled P1 and

Question:

There are three factories on the Momiss River. Each emits two types of pollutants, labeled P1 and P2, into the river. If the waste from each factory is processed, the pollution in the river can be reduced. It costs $1500 to process a ton of factory 1 waste, and each ton processed reduces the amount of P1 by 0.10 ton and the amount of P2 by 0.45 ton. It costs $1000 to process a ton of factory 2 waste, and each ton processed reduces the amount of P1 by 0.20 ton and the amount of P2 by 0.25 ton. It costs $2000 to process a ton of factory 3 waste, and each ton processed reduces the amount of P1 by 0.40 ton and the amount of P2 by 0.30 ton. The state wants to reduce the amount of P1 in the river by at least 30 tons and the amount of P2 by at least 40 tons.
a. Use Solver to determine how to minimize the cost of reducing pollution by the desired amounts. Are the LP assumptions (proportionality, additivity, divisibility) reasonable in this problem?
b. Use SolverTable to investigate the effects of increases in the minimal reductions required by the state. Specifically, see what happens to the amounts of waste processed at the three factories and the total cost if both requirements (currently 30 and 40 tons, respectively) are increased by the same percentage. Revise your model so that you can use SolverTable to investigate these changes when the percentage increase varies from 10% to 100% in increments of 10%. Do the amounts processed at the three factories and the total cost change in a linear manner?

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Data Analysis And Decision Making

ISBN: 415

4th Edition

Authors: Christian Albright, Wayne Winston, Christopher Zappe

Question Posted: