Question

1 Approved Answer

Rahat engineering has been assigned to develop a project that is a construction based project. This project is the combination of multiple dependent and independent

Rahat engineering has been assigned to develop a project that is a construction based project. This project is the combination of multiple dependent and independent project modules. Company is in real trouble in estimating the total time to develop the whole project [when their engineers try to estimate the total time of the project every time project estimated time comes different]. First four modules individually take one week to be completed and the last 5 modules individually take two weeks to completed. You have to design a solution (algorithm, with the help of the graph), that can solve the current problem (to estimate the total time to complete the project] faced by Rahat engineering. (Exact solution or the pseudo solution) You have to first solve the problem that why this project estimation is not right and then after that when project starts at one time at max two activities can be done if possible but not more than two at one time.image text in transcribed

Question 3 Rahat engineering has been assigned to develop a project that is a construction P1 P2, P4 based project. This project is the combination of multiple dependent and independent project modules. Company is in real trouble in estimating the total time to develop the whole project (when their engineers try to estimate the total time of the project every time project estimated time comes different]. P5 P4, P6 First four modules individually take one week to be completed and the last 5 P6 P7 modules individually take two weeks to completed. You have to design a P7 P8 solution [algorithm, with the help of the graph), that can solve the current P8 P2, P4 problem (to estimate the total time to complete the project] faced by Rahat engineering. (Exact solution or the pseudo solution] You have to first solve the problem that why this project estimation is not right and then after that when project starts at one time at max two activities can be done if possible but not more than two at one time

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Relational Database And Transact SQL

Authors: Lucy Scott

1st Edition

1974679985, 978-1974679980

More Books

Students also viewed these Databases questions

Question

6. What is process reengineering? Why is it relevant to training?

Answered: 1 week ago