Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Ready Homes Inc. manufactures and assembles prefabricated Steel and Concrete Structures which are used for the construction of starter Homes. There are three (3)
Ready Homes Inc. manufactures and assembles prefabricated Steel and Concrete Structures which are used for the construction of starter Homes. There are three (3) support departments and two (2) production departments. The budgeted costs and the normal activity levels for each department are given below. Support Departments Design and Fabrication Installation Personnel & assembly Production Departments Steel Concrete Overhead costs Square feet Number of employees Material Cost Total production in square meters Direct labor cost $300,000 $3,200,000 $4,800,000 200 4 12,000 18,000 160,000 172,000 40 32 50 60 $200,000 $1,350,000 $1,420,000 5,400,000 $8,200,000 400,000 600,000 $700,000 $1,262,500 The allocation bases are as follows: Design - Number of Employees; for Fabrication - Square feet and for Installation - Material costs. The production department allocates overhear cost to each case based on the budgeted cases produced for each product. Required 1). Using the Step-down method, allocate the Design and personnel cost. 2). Set up the equations that should be solved if the reciprocal method is used to allocate the two-remaining support department cost to the production departments. 3). Determine the total cost per square meter using the reciprocal method of support cost allocation.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started