Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Refer to Table.S6.1 - Factors for Computing Control Chart Limits (3 sigma) for this problem. West Battery Corp. has recently been receiving complaints from retailers

image text in transcribed
Refer to Table.S6.1 - Factors for Computing Control Chart Limits (3 sigma) for this problem. West Battery Corp. has recently been receiving complaints from retailers that its 9-volt batteries are not lasting as long as other name brands. James West, head of the TQM program at West's Austin plant, believes there is no problem because his batteries have had an average life of 55 hours, about 10% longer than competitors' models. To raise the lifetime above this lovel would require a new level of technology not available to West. Nevertheless, he is concemed enough to set up hourly assembly line checks. Previously. after ensuring that the process was running properly. West took samples of 59 -volt batteries for 25 test to establish the standards for control chart limits. Those 25 tests are shown in the following table: This exercise contains only parts a and b. a) For the given data, the x= hours (round your response to three decimal places). Refer to Table.S6.1 - Factors for Computing Control Chart Limits (3 sigma) for this problem. West Battery Corp. has recently been receiving complaints from retailers that its 9-volt batteries are not lasting as long as other name brands. James West, head of the TQM program at West's Austin plant, believes there is no problem because his batteries have had an average life of 55 hours, about 10% longer than competitors' models. To raise the lifetime above this lovel would require a new level of technology not available to West. Nevertheless, he is concemed enough to set up hourly assembly line checks. Previously. after ensuring that the process was running properly. West took samples of 59 -volt batteries for 25 test to establish the standards for control chart limits. Those 25 tests are shown in the following table: This exercise contains only parts a and b. a) For the given data, the x= hours (round your response to three decimal places)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Project Management Achieving Competitive Advantage

Authors: Jeffrey K. Pinto

3rd edition

132664151, 978-0132664158

More Books

Students also viewed these General Management questions