Question
1 Approved Answer
Refer to the cost data, Picture below. Take off the square feet of wall forms and cubic yards of ready mix concrete for the walls
Refer to the cost data, Picture below. Take off the square feet of wall forms and cubic yards of ready mix concrete for the walls of the elevator pit. Determine the total material and labor cost for the wall forms and ready mix concrete. After answering your question which must show all the formulas and all procedures
Cost Data | |||
Material | Unit | Material Unit Cost* | Labor Unit Cost* |
Wall forms, Job built | sq ft contact area | 1.28 | 4.25 |
Concrete, ready mix, 3500 psi | Cu yd | 67 | - |
#4 @ 16 3'0 78" #4 TYP #4 @ 12 V. #4 @ 10 H. in 2-#4 CONT 6" CONT. WATER STOP NEUTRA.PIT ONLY #418" EW 8" 8" ELEVATOR PIT -8" SLAB W/#4 @ 8" ELEV. PIT ONLY #4 @ 18" 9 TYP 11'-10 3/8 67'-9 5/8 ELEV. EQUIP. RAM 9"-10 S1.2 Print 6-2 2008 American Technical Publishers, Inc. All rights reserved. 4"
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started