Refer to the cost data, Picture below. Take off the square feet of wall forms and cubic yards of ready mix concrete for the walls

Refer to the cost data, Picture below. Take off the square feet of wall forms and cubic yards of ready mix concrete for the walls of the elevator pit. Determine the total material and labor cost for the wall forms and ready mix concrete. After answering your question which must show all the formulas and all procedures

Cost Data

Material

Unit

Material Unit Cost*

Labor Unit Cost*

Wall forms, Job built

sq ft contact area

1.28

4.25

Concrete, ready mix, 3500 psi

Cu yd

67

-

image

#4 @ 16 3'0 78" #4 TYP #4 @ 12 V. #4 @ 10 H. in 2-#4 CONT 6" CONT. WATER STOP NEUTRA.PIT ONLY #418" EW 8" 8" ELEVATOR PIT -8" SLAB W/#4 @ 8" ELEV. PIT ONLY #4 @ 18" 9 TYP 11'-10 3/8 67'-9 5/8 ELEV. EQUIP. RAM 9"-10 S1.2 Print 6-2 2008 American Technical Publishers, Inc. All rights reserved. 4"

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Computer Architecture Fundamentals And Principles Of Computer Design

Authors: Joseph D. Dumas II

2nd Edition

1032097337, 978-1032097336

More Books

Students also viewed these Civil Engineering questions

Question

1. Think out loud as you solve problems.

Answered: 1 week ago