Refurbishment of Chemical Lab Draw an Activity On Arrow (AOA) network for a project given in the table. Show the project scheduling on a Gantt

image text in transcribed

Refurbishment of Chemical Lab Draw an Activity On Arrow (AOA) network for a project given in the table. Show the project scheduling on a Gantt chart including total float. Present the profile of machine requirements for the project. Suggest an appropriate resource leveling if the project have a limitation of 2 machines only. [50 marks] Activity List Depend Upon Machine 1 1 1 ACTIVITY LIST 1 Strip room 2 Repair wall and ceiling 3 Repair floor 4 Lay vinyl floor 5 Rough in plumbing and electrical 6 Finish in plumbing and electrical 7 Replace existing fume duct 8 Install new fume hood 9 Install 1/3 base cabinet 10 Install wall cabinet 11 Install chemical sink 12 Paint cabinets 13 Paint walls and ceiling 14 Obtain vinyl floor covering 15 Obtain cabinet 16 Obtain fume hood 17 Obtain chemical sink 18 Painter availability 19 Install 2/3 base cabinet 1, 5, 7 1.5 3, 12, 13, 14 1 2, 3, 5, 9, 10, 11, 19 1 2. 3. 16 2, 3, 8, 15 2, 3, 7, 15 2, 3, 5, 9, 17 6, 8, 9, 10, 11, 18 2, 3, 6, 8, 9, 10, 18 1 1 1 1 - 2. 3. 9. 15 Refurbishment of Chemical Lab Draw an Activity On Arrow (AOA) network for a project given in the table. Show the project scheduling on a Gantt chart including total float. Present the profile of machine requirements for the project. Suggest an appropriate resource leveling if the project have a limitation of 2 machines only. [50 marks] Activity List Depend Upon Machine 1 1 1 ACTIVITY LIST 1 Strip room 2 Repair wall and ceiling 3 Repair floor 4 Lay vinyl floor 5 Rough in plumbing and electrical 6 Finish in plumbing and electrical 7 Replace existing fume duct 8 Install new fume hood 9 Install 1/3 base cabinet 10 Install wall cabinet 11 Install chemical sink 12 Paint cabinets 13 Paint walls and ceiling 14 Obtain vinyl floor covering 15 Obtain cabinet 16 Obtain fume hood 17 Obtain chemical sink 18 Painter availability 19 Install 2/3 base cabinet 1, 5, 7 1.5 3, 12, 13, 14 1 2, 3, 5, 9, 10, 11, 19 1 2. 3. 16 2, 3, 8, 15 2, 3, 7, 15 2, 3, 5, 9, 17 6, 8, 9, 10, 11, 18 2, 3, 6, 8, 9, 10, 18 1 1 1 1 - 2. 3. 9. 15

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Financial & Managerial Accounting, 1, 2 Terms (12 Months)

Authors: Carl S. Warren, James M. Reeve, Jonathan Duchac

14th Edition

133727075X, 9781337270755

More Books

Students also viewed these Accounting questions