Remove load arms, replace bond/ground cables, confirm proper placards and verify loaded products and volumes are all examples of: O a) Pre-load procedures O
Remove load arms, replace bond/ground cables, confirm proper placards and verify loaded products and volumes are all examples of: O a) Pre-load procedures O b) Offload procedures O c) Loading procedures Od) Post Load procedures