Required Information Greenwood Company manufactures two products -13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering Implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional Information is available for the company as a whole and for Products Y and Z Activity Cost Pool Machining Machine setups Production design General factory Activity Measure Machine hours Number of setups Number of products Direct labor-hours Estimated Overhead Cost $ 231.ee $ 55.900 $77,00 $364,500 Expected Activity 12.000 Mits 130 setups 2 products 15.6 LHS Product Y Product 2 4.700 Activity Measure Machining Number of setups Number of products Direct Labor-hours 2 1 7.700 9 Using the ABC system how much total manufacturing overhead cost would be assigned to Product Y? (Round your intermediate calculations to 2 decimal places. Round your answers to the nearest coller amount.) Total manufacturing ovome dont Required Information Greenwood Company manufactures two products-13.000 units of Product Y and 5,000 u uses a plantwide overhead rate based on direct labor-hours. It is considering Implementin (ABC) system that allocates all of its manufacturing overhead to four cost pools. The follow avallable for the company as a whole and for Products Y and Z: Estimated Overhead Cost Expected Activity Cost Pool Machining Machine setups Production design General factory Activity reasure Machine-hours Number of setups Number of products Direct labor-hours 17, enes 138 setups $ 55,9ee 15,803 DES etivity Measure Product her of setups Direct laboreneurs Using the ABC system how much total manufacturing overhead cost would be assigned to alculations to 2 decimal places. Round your answers to the nearest dollar amount.) Toe annet