Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Required information Problem 04-3A Applying activity-based costing LO P1, P3, A1, A2, C3 [The following information applies to the questions displayed below.) Craft Pro Machining

image text in transcribed
image text in transcribed
image text in transcribed
image text in transcribed
Required information Problem 04-3A Applying activity-based costing LO P1, P3, A1, A2, C3 [The following information applies to the questions displayed below.) Craft Pro Machining produces machine tools for the construction industry. The following details about overhead costs were taken from its company records. Production Activity Indirect Labor Indirect Materials Other Overhead Grinding $320,000 Polishing $145,000 Product modification 450,000 Providing power $260,000 System calibration 510,000 Additional information on the drivers for its production activities follows. Grinding and Polishing Product modification Providing power System calibration 11,000 machine hours 1,300 engineering hours 19,000 direct labor hours 600 batches Number of units Machine hours Engineering hours Batches Direct labor hours Job 3175 120 units 550 MH eng. 27 hours 15 batches 500 DLH Job 4286 1,500 units 5,508 MH 30 eng. hours 45 batches 4,500 DLH Required: 1. Classify each activity as unit level, batch level, product level, or facility level. Grinding Polishing Product modification Providing power System calibration quired: 3 & 4. Compute the activity overhead rates using ABC. Combine the grinding and polishing costs into a single cost pool. Determine erhead costs to assign to the above jobs using ABC. What is the overhead cost per unit for Job 3175? What is the overhead cost per it for Job 4286? (Round your activity rate and average overhead cost per unit to 2 decimal places. Round "overhead assigned the nearest whole dollar.) Job 3178 Activity driver incurred Overhead Activity incum Overhead Coat Activity Rome Grinding & Polishing Product modification Activity Drivers Machine hours Engineering his Direct labore batches Providing power System calibration Required: 5. If the company uses a plantwide overhead rate based on direct labor hours, what is the overhead cost for each unit of Job 3175? Of Job 42867 (Do not round intermediate calculations. Round "OH Cost per unit" answers to 2 decimal places.) OH Cost per unit Units Produced Product DL hours Plantwide OH Total Overhead Cost rate $ 0.00 $ 0 Job 3175 Job 4286 $ 0.00 $ 0

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

For Mowen/hansen/heitgers Cornerstones Of Managerial Accounting, 6th Edition, [instant Access]

Authors: Maryanne M. Mowen, Don R. Hansen, Dan L. Heitger

6th Edition

1305280768, 9781305280762

More Books

Students also viewed these Accounting questions