Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

! Required information Problem 5-57 Activity-Based Costing; Activity Cost Pools; Pool Rates; Calculation of Product Costs; Cost Distortion (LO 5-1, 5-2,5-3,5-4,5-5) [The following information applies

image text in transcribed
image text in transcribed
image text in transcribed
image text in transcribed
! Required information Problem 5-57 Activity-Based Costing; Activity Cost Pools; Pool Rates; Calculation of Product Costs; Cost Distortion (LO 5-1, 5-2,5-3,5-4,5-5) [The following information applies to the questions displayed below.) Knickknack, Inc. manufactures two products: Odds and Ends. The firm uses a single, plantwide overhead rate based on direct-labor hours. Production and product-costing data are as follows: Production quantity Direct material Direct labor (not including setup time) Manufacturing overhead Total cost per unit Odds 1,000 units 40 30 (2 hr. at $15) 96 (2 hr. at $48) $ 166 Ends 5,000 units $ 60 45 (3 hr. at $15) 144 (3 hr. at $48) $ 249 h Manufacturing overhead budget: Machine-related costs Setup and inspection Engineering Plant-related costs Total $450,000 180,000 90,000 96,000 5816,000 Predetermined overhead rate: Problems Saved Budgeted manufacturing overhead Budgeted direct-labor hours $816,000 (1,890) (2) + (5,800) (3) - $48 per direct-labor hour Knick knack, Inc. prices its products at 120 percent of cost, which yields target prices of $199.20 for Odds and $298.80 for Ends. Recently, however, Knickknack has been challenged in the market for Ends by a European competitor, Bricabrac Corporation. A new entrant in this market, Bricabrac has been selling Ends for $220 each. Knickknack's president is puzzled by Bricabrac's ability to sell Ends at such a low cost. She has asked you (the controller) to look into the matter. You have decided that Knickknack's traditional, volume-based product-costing system may be causing cost distortion between the firm's two products. Ends are a high-volume, relatively simple product. Odds, on the other hand, are quite complex and exhibit a much lower volume. As a result, you have begun work on an activity-based costing system. Activity Cost Pool Machine-related costs Setup and inspection Engineering Plant-related costs Cost Driver Machine hours Number of production runs Engineering change orders Square footage of space Budgeted level of cost Driver 9,800 hr. 40 runs 100 change orders 1,920 sq. ft. . You have gathered the following additional information: Each odd requires 4 machine hours, whereas each end requires 1 machine hour Odds are manufactured in production runs of 50 units each. Ends are manufactured in 250-unit batches. Three-quarters of the engineering activity, as measured in terms of change orders, is related to Odds. The plant has 1,920 square feet of space, 80 percent of which is used in the production of Odds Problem 5-57 Part 2 Two Problems Seved Ihree-quarters of the engineering activity, as measured in terms of change orders, is related to Udas. The plant has 1,920 square feet of space, 80 percent of which is used in the production of Odds Problem 5-57 Part 6 6. Show that the ABC system fully assigns the total budgeted manufacturing overhead costs of $816,000. (Round your intermediate calculations and final answers to 2 decimal places.) Odds Ends Manufacturing overhead costs per unit Machine-related Setup and inspection Engineering Plant-related Total overhead cost per unit Production volume Total overhead assigned Total = $ 0.00 $ 0.00 $ 0.00 $ 0.00 0 S ep Two Problems A Saved Activity Cost Pool Machine-related costs Setup and inspection Engineering Plant-related costs Cost Driver Machine hours Number of production runs Engineering change orders Square footage of space Driver 9,800 hr. 40 runs 188 change orders 1,920 sq. ft. You have gathered the following additional information: Each odd requires 4 machine hours, whereas each end requires 1 machine hour. Odds are manufactured in production runs of 50 units each. Ends are manufactured in 250-unit batches. Three-quarters of the engineering activity, as measured in terms of change orders, is related to Odds. The plant has 1,920 square feet of space, 80 percent of which is used in the production of Odds. Problem 5-57 Part 7 7. Calculate the total amount of product cost distortion For entire product line caused by Knickknack's traditional, volume-based costing system. (Round your intermediate calculations to 2 decimal places. Negative amount should be indicated by a minus sign.) Odds Ends Total amount of cost distortion

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Buck's The Next Step Advanced Medical Coding And Auditing

Authors: Elsevier

1st Edition

0323762778, 978-0323762779

More Books

Students also viewed these Accounting questions

Question

WHEN did you discuss it?

Answered: 1 week ago