Answered step by step
Verified Expert Solution
Question
1 Approved Answer
reservior engineering a and b A gas cap reservoir is estimated to have an initial gas cap volume half of the size of its oil
reservior engineering a and b
A gas cap reservoir is estimated to have an initial gas cap volume half of the size of its oil zone. After 10 years of production, the ratio of the gas cap to the oil zone volume increases to 2/3. The cumulative oil and gas production as a function of average reservoir pressure are listed in Table 1. Also listed are the relevant PVT data. The initial reservoir pressure was 3400psia(PiPb) Table 1: PVT and production data (a) Determine the initial oil in place in STB (b) Determine the initial gas in place (both free gas and solution gas) in SCF Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started