Question
Road Ready Tire Co. manufactures automobile tires. Standard cost and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of
Road Ready Tire Co. manufactures automobile tires. Standard cost and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 5,200 tires were as follows: Standard Cost Actual costs Direct materials 71,000 lbs. @ 5.10 70,600 lbs. @ 5.00 Direct labor 1,300 hrs. @ 17.50 1,330 hrs. @ 17.80 Factory overhead Rates per direct labor hr, based on 100% of normal capacity of 1,350 direct labor hrs.
Variable cost 3.10 4,000 Variable cost Fixed cost 4.90 6,615 Fixed cost Each tire requires 0.25 hour of direct labor.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started