Question
Rochester Manufacturing Corporation (RMC) is considering moving some of its production from traditional numerically controlled machines to a flexible manufacturing system (FMS). Its computer numerical
Rochester Manufacturing Corporation (RMC) is considering moving some of its production from traditional numerically controlled machines to a flexible manufacturing system (FMS). Its computer numerical control machines have been operating in a high-variety, low-volume manner. Machine utilization, as near as it can determine, is hovering around 10%. The machine tool salespeople and a consulting firm want to put the machines together in an FMS. They believe that a $3 million expenditure on machinery and the transfer machines will handle about 30% of RMC’s work. There will, of course, be a transition and start-up costs in addition to this. The firm has not yet entered all its parts into a comprehensive group technology system but believes that the 30% should fit very nicely into a “family”. A reduction, because of higher utilization should take place in the number of pieces of machinery. The firm should be able to go from 15 to about 4 machines and personnel should go from 15 to perhaps as low as 3. Similarly, floor space reduction will go from 20,000 square feet to about 6,000. Throughput of orders should also improve with the processing of this family of parts in 1 to 2 days rather than 7 t0
Inventory reduction is estimated to yield a one-time $ 750,000 savings and annual labour savings should be in the neighbourhood of $ 300, 000. Although the projections all look very positive, an analysis of the project’s return on investment
showed it to be between 10% and 15% per year. The company has traditionally had an expectation that projects should yield well over 15% and have payback periods of substantially less than 5 years.
1. As a production manager for RMC, what do you recommend? Why?
2. Prepare a case by a conservative plant manager for maintaining the status quo until the returns are more obvious.
3. Prepare the case for an optimistic sales manager that you should move ahead with the
Step by Step Solution
3.50 Rating (157 Votes )
There are 3 Steps involved in it
Step: 1
1The most appropriate action is to stick to traditional operations because the proposed flexible man...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started