Rocky Mountain Corporation makes two types of hiking boots-Xactive and Pathbreaker. Data concerning these two product lines appear below: Direct materiale per unit Direct labor cost per unit Direct labor-hours per unit Estimated annual production and sales Xactive $ 65.30 18.70 114 DE 30,000 units Pathbreaker $ 51.50 13.50 1 DIN 20000 units The company has a conventional costing system in which manufacturing overhead is applied to units based on direct lobor-hours. Data concerning manufacturing overhead and direct labor-hours for the upcoming year appear below: Estimated total manufacturing overhead Estimated total direct labor-hours $2,501.000 1221000 DLA Required: 1-a. Compute the predetermined overhead rate based on direct labor-hours. 1-5. Using the predetermined overhead rate and other data from the problem, determine the unit product cost of each product. 2. The company is considering replacing its conventional costing system with an activity-based costing system that would assign its manufacturing overhead to the following four activity cost pools: Activity Coat Pools and Activity Measures Supporting direct labor direct labor-hours) Batch setups (setus) Product witalning (humber of products) General factory (nachine-hours) Total manufacturing overhead cost Estimated Overhead cout $ 915,000 877.500 $26.000 82500 $ 2,501.000 Expected Activas Xactive Pathbreake Total 42.000 80,000 122,000 275 105 450 1 1 3,000 8,000 11,000 Determine the activity rate for each of the four activity cost pools. 3. Using the activity rates and other data from the problem, determine the unit product cost of each product. Answer is not complete. Complete this question by entering your answers in the tabs below. Reg 1A Reg 18 Reg 2 Reg 3 Determine the activity rate for each of the four activity cost pools, (Round your "per and "per MHR answers to 2 decimal places.) Activity Cost Pools Activity Rate