Rocky Mountain Corporation makes two types of hiking boots-Xactive and Pathbreaker. Data concerning these two product lines appear below: Direct materials per unit Direct labor cost per unit Direct labor-hours per unit Estimated annual production and sales Xactive $ 65.70 $ 19.10 1.4 DLHS 34,000 units Pathbreaker $ 51.90 $ 13.90 1 DLHS 84,000 units The company has a conventional costing system in which manufacturing overhead is applied to units based on direct labor-hours. Data concerning manufacturing overhead and direct labor-hours for the upcoming year appear below: Estimated total manufacturing overhead Estimated total direct labor-hours $2,750, 440 131,600 DLHS Required: 1-a. Compute the predetermined overhead rate based on direct labor-hours. 1-b. Using the predetermined overhead rate and other data from the problem, determine the unit product cost of each product 2. The company is considering replacing its conventional costing system with an activity-based costing system that would assign its Activity Cost Pools and Activity Measures Supporting direct labor (direct labor-hours) Batch setups (setups) Product sustaining (number of products) General factory (machine-hours) Total manufacturing overhead cost Estimated Overhead Cost $1,013,320 1,053,5ee 592,760 90,860 $2,750, 440 Expected Activity Xactive Pathbreaker Total 47,600 84,099 131,600 295 195 490 1 1 2 3,400 8,40e 11,800 Determine the activity rate for each of the four activity cost pools. 3. Using the activity rates and other data from the problem, determine the unit product cost of each product. Complete this question by entering your answers in the tabs below. Reg 1A Reg 1B Reg 2 Reg 3 Compute the predetermined overhead rate based on direct labor-hours. (Round your answer to 2 decimal places.) Predetermined overhead rate per DLH