Question
RoseBusch is a manufacturer of large flower pots for urban settings. The company has these standards for their purple flower pots: Standards Direct Materials (Purple
RoseBusch is a manufacturer of large flower pots for urban settings. The company has these standards for their purple flower pots:
Standards
Direct Materials (Purple Resin) | 10 pounds per pot at a cost of $4.00 per pound |
Direct Labor | 2.0 hours at a cost of $17.00 per hour |
Standard Variable Manufacturing Overhead Rate | $3.00 per direct labor hour |
Budgeted Fixed Manufacturing Overhead | $10,000 |
Standard Fixed MOH Rate | $7.00 per direct labor hour (DLH) |
RoseBusch allocated fixed manufacturing overhead to production based on standard direct labor hours. The Company expected to produce 1,200 pots. Last month, RoseBusch reported the following actual results for the production of only 1,000 flower pots:
Actual
Direct Materials | Purchased 10,500 pounds at a cost of $4.50 per pound; used 10,500 pounds to produce 1,000 pots |
Direct Labor | Worked 2.2 hours per flower pot (2,200 Total DLH) at a cost of $15.00 per hour |
Actual Variable Manufacturing Overhead Rate | $3.40 per direct labor hour for total actual variable manufacturing overhead of $7,480 |
Actual Fixed Manufacturing Overhead | $11,400 |
Standard Fixed Manufacturing Overhead Allocated Based on Actual Production | $14,000 |
Complete the Excel Spreadsheet table that you downloaded from the Unit 7 Preparation Page page. (50 points)
Compute and put in the spreadsheet:
the direct materials price variance
the direct materials quantity variance
Compute and put in the spreadsheet:
the direct labor rate variance
the direct labor efficiency variance
Compute and put in the spreadsheet the variable manufacturing overhead variances.
Compute Compute and put in the spreadsheet the fixed manufacturing overhead variances.
Compute the Variable Manufacturing Overhead Variances | ||
Price variance | ||
Efficiency variance | ||
Compute the fixed manufacturing overhead variances | ||
Price variance | ||
Production volume variance |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started