Sawing Sanding 20 min/unit 20 min/unit Welding 30 min/unit Drilling 32 min/unit Assembly 93 min/unit Assembly 93 min/unit Assembly 93 min/unit A production process

image text in transcribed

Sawing Sanding 20 min/unit 20 min/unit Welding 30 min/unit Drilling 32 min/unit Assembly 93 min/unit Assembly 93 min/unit Assembly 93 min/unit A production process is shown in the figure above. The drilling operation occurs separately from, and simultaneously with the sawing and sanding operations. Welding starts when both drilling and sanding operations have been completed. After welding, a product needs to go through only one of the three assembly operations (the operations are in parallel, where parallel lines perform the exact same operation). Currently, the production process generate outputs at the rate of 0.5 units/hour. What is the utilization of the "Drilling" station?

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Intermediate Financial Management

Authors: Eugene F. Brigham, Phillip R. Daves

13th Edition

1337395080, 9781337395083

Students also viewed these General Management questions

Question

=+b) Are the conditions for two-way ANOVA met?

Answered: 1 week ago

Question

Why are stocks usually more risky than bonds?

Answered: 1 week ago