SC 301 Tractor Mower Co-Lean Six Sigma Team Assignment- Turn in with McDonald's French Fry leach worth so Pts) a and Other Ideas to Reduce Mower Costs Selling Price (To Retailer) $1,600 Description Summary Cost Red'n Idea Est'd Cost Red'n*New Cost # Cost Elements (8 in Total) $ Values in Col'n $Values in Col'n Materials Cost per Mower 1 Mower & It's Parts 2 Plywood Protective Pke's $350 Kohler Steel Engine & Steel body w/foam seat $280 1/2 inch thick plywood $12 $10 Hardwood Pallet $652 3 Brass Hinges Sub Total Mtls Plant Labor Cost per Mower Shipping Crate Assembly Total DMC Mower Assembly 5 6 $100 Automated Prod'n Line at 20 per hour $10 Assemble Crate Manually $110 Plant Labor Rate $25/h 7 Transportation (Pre Cowan) $29 Rounded from $28.57 8 Warehouse Labor $4 $795 $805 COGS Gross Margin Gross Margin % 50% "Based on shipment of 1000 miles at $1 per mile in 53' Trailer with 45,000 lb loadable wt *Provide up to a 1/2 page for each idea with Assumptions and Financial Analysis Entire Facility Operates One Shift from 8 am to 4:30 pm for an 8 hour paid work day Hourly employees 2 paid 15 min breaks; One 30 minute unpaid lunch The 15 min breaks for the entire facility are 10 to 10:15 am and 2:30 to 2:45 pm The lunch period for the entire facility is 12 to 12:30 pm. SC 301 Tractor Mower Co-Lean Six Sigma Team Assignment- Turn in with McDonald's French Fry leach worth so Pts) a and Other Ideas to Reduce Mower Costs Selling Price (To Retailer) $1,600 Description Summary Cost Red'n Idea Est'd Cost Red'n*New Cost # Cost Elements (8 in Total) $ Values in Col'n $Values in Col'n Materials Cost per Mower 1 Mower & It's Parts 2 Plywood Protective Pke's $350 Kohler Steel Engine & Steel body w/foam seat $280 1/2 inch thick plywood $12 $10 Hardwood Pallet $652 3 Brass Hinges Sub Total Mtls Plant Labor Cost per Mower Shipping Crate Assembly Total DMC Mower Assembly 5 6 $100 Automated Prod'n Line at 20 per hour $10 Assemble Crate Manually $110 Plant Labor Rate $25/h 7 Transportation (Pre Cowan) $29 Rounded from $28.57 8 Warehouse Labor $4 $795 $805 COGS Gross Margin Gross Margin % 50% "Based on shipment of 1000 miles at $1 per mile in 53' Trailer with 45,000 lb loadable wt *Provide up to a 1/2 page for each idea with Assumptions and Financial Analysis Entire Facility Operates One Shift from 8 am to 4:30 pm for an 8 hour paid work day Hourly employees 2 paid 15 min breaks; One 30 minute unpaid lunch The 15 min breaks for the entire facility are 10 to 10:15 am and 2:30 to 2:45 pm The lunch period for the entire facility is 12 to 12:30 pm