Scenario E.1 SimQuick is being used to simulate the following bank process: Customer arrivals at the Entrance Door of the bank with an average time between arrivals of 2.5 minutes. The Line Buffer holds 6 customers. If a customer arrives and the buffer line is filled, the customer leaves. The Work Station Teller's processing time per customer is normally distributed, with a mean of 3.0 minutes and a standard deviation of 0.5 minutes. The Served Customer Buffer in the flow chart is used to count the number of customers processed during the period simulated. A 2-hour period was simulated. The SimQuick simulation is run, and the results are as follows:
Element Types | Element Names | Statistics | Overall Means |
Entrance | Door | Objects entering process | 41.80 |
Objects unable to enter | 6.23 | ||
Service level | 0.87 | ||
Buffer | Line | Objects leaving | 37.83 |
Final inventory | 3.98 | ||
Minimum inventory | 0.00 | ||
Maximum inventory | 5.85 | ||
Mean inventory | 3.08 | ||
Mean time in buffer | 9.75 | ||
Work Station | Teller | Work cycles started | 37.83 |
Fraction time working | 0.94 | ||
Buffer | Served Customers | Final inventory | 36.85 |
The arrival of customers at a lemonade stand is modeled in SimQuick using a(n):
Group of answer choices
workstation block.
decision point.
entrance block.
buffer block.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started